exclamation symbol on the field) that the scope of this issue will take longer than planned.īeta Was this translation helpful? Give feedback. If we have a specific end date on the parent it should show a warning (e.g. If the date of a 'child' issue extends beyond its original estimate, how would you like this to reflect in the 'parent' issue, if at all?.otherwise yes, auto add the date from the childs. There are two ways to remove a task from the timeline: Click once on the bar, diamond, or callout text, and then, on the box that appears, click Remove from Timeline. if it could inherit from the childs it could be overridden with a concrete date on the parent issue. but I guess your current data model needs to have concrete values set to the issue. basically inherit from the childs without setting a specific date on the parent. It would be great to have dynamic dates for the parent. If there aren't dates defined for the 'parent' issue (where the tasklist is defined), would you expect or want dates to be auto-populated/added to the parent, that cover the timeframe of all children issues?.but it has some downsides like not being able to use something else to group and having the parent issue in another group.